Well Done SISK

Building contractor SISK have done a great job in laying down the new surface in the court yard, an improvement, don’t you think?. With the building still under the defects period one of the main defects was the state of the court yard paths. A more durable material has been applied with most of the project finalized residents can finally use the pathway as normal.

The Irrigation issue is still at hand but Sisk confirm the said issue is being managed by LRM as is the main entrance problem.